Search for more Public Notices in your area
Highways England Company Limited
Traffic

M1 MOTORWAY (JUNCTIONS 1-3), M25 MOTORWAY JUNCTION 23, AND A1 TRUNK ROAD TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MF0519826

Notice effective from
24th October 2019 to 23rd November 2019

highways

england

M1 MOTORWAY(JUNCTIONS 1-3), M25 MOTORWAYJUNCTION 23, AND A1 TRUNK ROAD

TEMPORARYTRAFFIC RESTRICTIONS

Notice is hereby given that Highways England Company Limited has made an Order on the M25 Motorway in the County of Hertfordshire and the London Boroughs of Barnet and Hendon, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order is to authorise the overnight closure, in phases, of:-

a) the entirecirculatory carriageway of the roundabout at M25 Junction 23 (A1(M)/A1);



b) the roads leading to and from both carriageways of the M25 at Junction 23 (A1(M) Junction 1/A1);



c) the roads leading to and from both carriageways of the A1(M)/A1 at Junction 23 (A1(M) Junction 1/A1);



d) the southbound carriageway of the A1 between Bignell'sCorner (M25 Junction 23) and Borehamwood Interchange (A5135);



e) the road leading from the southbound carriageway of the A1 at Borehamwood Interchange (A5135);



f) the northbound carriageway of the M1 between Junction 1(A406) and the tip of the nosing of the entry slip road at Junction 3(London Gateway Services);



g) the road leading to the northbound carriageway of the M1 at Junction 1(A406);



h) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to Staples Corner roundabout at Junction 1



(A406);

i) the roads connecting to and from both carriageways of the M1 at Junction 2(A1); and



j) all of the roads leading to and from both carriageways of the M1 at London Gateway Services.

These measures areinthe interests of road safety while contractors undertake resurfacing and lighting works including road marking, stud and loop replacement, column, cable, ducting, cabinet and pillar replacement and all associated works.

The work is part of aproject which is expected to last for 18 months starting on or after Tuesday 5th November 2019. Precise location timing to be advised by advanced roadside and gantry signing. The overnight closures will vary according to the contracted working hours for the road affected and will not exceed 2100-0600 hours. The Order will come into force on 3November 2019 and continue until completion of the works or until 3May 2021 whichever is sooner.

Traffic affected by the closures will be diverted using other junctions on the M25 and M1, and

by using the A1(M), A1, A41, and A406, A411,

A1081, and A5183. The diversion in operation will vary according to the closureinforce. The temporary closures and diversion routes will be clearly indicated by traffic signs when they areinoperation during the works period.

JDownham, an Official of Highways England Co. Ltd. Ref: HE/SE/2019/M25/220 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey,GU1 4LZ. Acompany registered in England and Wales.

For enquiries, please contact the Customer

Contact Centreon0300123 5000 or

info@highwaysengland.co.uk

.

https://www.highwaysengland.co.uk



Attachments

MF0519826.pdf Download

Comments


or Register to leave a comment and/or receive comment alerts.

Related notices