A HUGE biomass boiler storage unit has been lifted into place outside high flats in Gourock.

The building was installed at River Clyde Homes' Eastern View tower block on Thursday.

A large, portable crane was used to lift the building and lower it onto a section of the car park.

A lane of Broomberry Drive was closed while the work was carried out.