A PLANNED stop off by a gigantic cruise ship that has been a frequent visitor to Greenock this year was cancelled due to concerns about the weather.
Mein Schiff 2 had been expected to call at Greenock Ocean Terminal today, but had to be rerouted due to weather conditions.
Operated by TUI, the vessel is on a 10-day round-trip from Hamburg that began on September 5.
The ship would have brought approximately 2,900 passengers to the Inverclyde port.
Read more
Polish firm revealed CalMac job boost the same week Ferguson announced staff cuts
Live - A8 has reopened after serious crash which saw it shut for more than 7 hours
Debate - Is an AI data centre the right future for Spango Valley?
Built in 2019 by Meyer Turku Shipyard in Finland, Mein Schiff 2 features 16 decks, 12 dining areas, 15 bars and lounges, and a crew of around 1,000.
Passengers have access to a sauna, wellness spa, hair salon, and sports facilities.
The 315-metre-long ship also boasts a 438-metre outdoor jogging track and a large glass facade at the stern.
Some luxury suites include private rooftops and sunbathing terraces.
Share